The Township of Elizabethtown-Kitley has invested in the following Capital Projects for 2024.
These projects are in accordance with our long term goals and Strategic Plan.
Administration
Project Name: | Type of Project: | Basis for Activity: | Description | Process To Date |
Website Redesign | Information Technology | Service Level Change | To engage the services of a 3rd party developer to assist with an overhaul of the Township website to make it more user friendly and edit friendly | View Strategic Plan Relationship(s) |
Digital Signature Platform | Information Technology | Service Level Change | The purchase and implementation of a digital signatures platform | View Strategic Plan Relationship(s) |
Fire
Project Name: | Type of Project: | Basis for Activity: | Description | Process To Date |
Replace 1995 Kitley KR03 Rescue Vehicle | Fleet | Asset Renewal | Replacement rescue vehicle for Station No. 03 | View Strategic Plan Relationship(s) |
Battery Operated E Draulics (Rescue Tools) | Equipment | Asset Renewal |
Department wide transition to battery operated hydraulics includes: 2- SP 28-inch spreaders, 2- S E3 Cutters, 2- R E3 Rams, 1- SC E3 Combination Tool, 14 – Batteries, 7 – E3 Chargers |
View Strategic Plan Relationship(s) |
Replace 2000 Tanker #2 | Fleet | Asset Renewal | To Replace tanker # 2 | View Strategic Plan Relationship(s) |
Rescue # 1 – Upgrades | Vehicle | Upgrade to asset | Upgrades to Rescue to accommodate secure storage of battery-operated rescue tools | View Strategic Plan Relationship(s) |
Parks & Recreation
Project Name: | Type of Project: | Basis for Activity: | Description | Process To Date |
Blaine Healey Pavillion/Canteen | Facilities | Asset Renewal | Complete the Pavilion Project by transferring the electrical panels located in the old canteen building that control the Diamond lights over to the new utility room within the pavilion. | View Strategic Plan Relationship(s) |
Play Structure – Eleanor Fulford | Equipment | Asset Renewal | Replacing the aged and undersized play structure in a growing family community. | View Strategic Plan Relationship(s) |
Bellamy Park Office | Facilities | Asset Renewal | In August, 2023, Council, through Report No. A-23-78 authorized the tenant to renovate the existing office, primarily exterior work by replacing all windows and doors, re-siding the entire structure and enhancing the internal floor base, to a maximum cost of $20K, to be funded from the Bellamy Park Reserve. | View Strategic Plan Relationship(s) |
Public Works
Project Name: | Type of Project: | Basis for Activity: | Description | Process To Date |
Tandem Plow Truck #10 | Vehicle | Asset Renewal | Tandem plow truck replacement for unit # 10 ( pre approved in 2023) | View Strategic Plan Relationship(s) |
Truck #5 F550 – Used | Vehicle | Asset Renewal | To replace unit # 5 with a newer asset | View Strategic Plan Relationship(s) |
Water Tank Replacement | Equipment | Asset Renewal | To purchase a new water tank to fit current fleet | View Strategic Plan Relationship(s) |
3 Ton Asphalt Box – Used | Equipment | Service Level Change | To purchase a used hot box for asphalt | View Strategic Plan Relationship(s) |
Utility Trainer | Equipment | Service Level Change | To purchase a utility trailer | View Strategic Plan Relationship(s) |
Portable Packer (Roller) – Used | Equipment | Service Level Change | To purchase a portable packer (roller) | View Strategic Plan Relationship(s) |
Kitley Line 3 | Road Construction | Asset Renewal |
Reconstruction of a section of Kitley Line 3 – 1.1 kms from Hughes Road. Work includes full depth reconstruction (pulverization of existing asphalt, fabric overlay, 6 inches B gravel, 4 inches A gravel and finished with asphalt surface. |
View Strategic Plan Relationship(s) |
New Dublin Road | Road Construction | Asset Renewal |
Reconstruction of a 1.9 km section of New Dublin Road from 6th Concession Road to CR 29. Work includes pulverization of existing roadway, 4 inches of A gravel and asphalt overlay. |
View Strategic Plan Relationship(s) |
Graham Lake Road | Road Construction | Asset Renewal |
Reconstruction of 2.6 km between CR 46 and the FOY border. Work includes pulverization of existing roadway, fabric overlay, 4 inches A gravel, 8 inches B gravel and double surface treatment with fog sealer. |
View Strategic Plan Relationship(s) |
Old Sharpe’s Lane (South of 401) | Road Construction | Asset Renewal |
Reconstruction of a 100m road plus 30m cul-de-sac. Work includes excavation of existing deteriorated roadway, fabric overlay, 4 inches A gravel, 8 inches B gravel for road and 12 inches B gravel for cul-de-sac and 50mm asphalt. |
View Strategic Plan Relationship(s) |
Applewood Circle | Road Construction | Asset Renewal |
Reconstruction of cul-de-sac from 2nd Concession Road to dead end. Work includes excavation of existing deteriorated roadway to enhance drainage and ditching, fabric overlay, 4 inches B gravel and 50mm asphalt. |
View Strategic Plan Relationship(s) |
Long Beach Drive | Road Construction | Asset Renewal |
Reconstruction of 350m of this dead-end cul-de-sac. Work includes pulverization of existing roadway, 4 inches A gravel, 12 inches B gravel and 50mm asphalt. |
View Strategic Plan Relationship(s) |
Butternut Bay Road | Road Construction | Asset Renewal |
Reconstruction and paving of .2km from Brockmere Cliff Work includes excavation of existing deteriorated roadway, ditching, drainage improvements, stabilization of base for 50mm asphalt. |
View Strategic Plan Relationship(s) |
Crystal Road | Roads Construction | Asset Renewal |
Reconstruction of 1500m of Crystal Road. Work includes pulverization, fabric overlay, 4 inches A gravel, 8 inches B gravel and finished with tar and chip. |
View Strategic Plan Relationship(s) |
Crack Sealing | Preventative Maintenance | Asset Life Cycle Maintenance | Participation in the UCLG Crack Sealing RFP to initiate a pavement preservation capital program for the Township road network. | View Strategic Plan Relationship(s) |